Our Projects

More Than a Builder, We're Your Business Partner

Building the infrastructure of your choice and meeting your expectation gives us the work satisfaction that motivates us for growth. We believe honesty and transparency are the most important elements of any business venture. We extensively communicate about every aspect of the construction procedure, from the designing and detailing to the type of construction material used in the project. We keep our clients in line with the progress made in the project at every stage. Proper client satisfaction is of utmost importance to us.

Filters:

Bareilly-Sitapur image 1
Bareilly-Sitapur image 2

Bareilly-Sitapur

Balance Work for Four-Laning of Bareilly-Sitapur Section of NH-24 from km 262.000 to km 413.200 in the State of Uttar Pradesh.

NHAI930 croresUttar PradeshCompleted
Pilibhit PKG-1 image 1
Pilibhit PKG-1 image 2

Pilibhit PKG-1

"Improvement and upgradation of the NH-74 (now NH-30) stretch from Bareilly to Pilibhit, covering km 0.00 to km 32.500, on a Hybrid Annuity Model (HAM) basis in the state of Uttar Pradesh. This is Package 1 of the Bareilly-Pilibhit-Sitarganj project.

NHAI667.57 croresUttar PradeshRunning
Hardoi Package - 2B image 1
Hardoi Package - 2B image 2

Hardoi Package - 2B

Improvement and upgradation of the existing road to a 4-lane configuration with paved shoulders from km 123.650 to km 175.080, extending from the start of Shahabad bypass to the end of Hardoi bypass on NH-731, Uttar Pradesh. The project will be executed on a HAM basis.

NHAI659.87 croresUttar PradeshRunning
Pilibhit PKG-2 image 1
Pilibhit PKG-2 image 2

Pilibhit PKG-2

Improvement and upgradation of the NH-74 (now NH-30) stretch from Pilibhit to Sitarganj, covering km 32.500 to km 64.800 and chainage 0.00 to 6.00 (Sitarganj bypass), on a Hybrid Annuity Model (HAM) basis in Uttar Pradesh and Uttarakhand. This is Package 2 of the Bareilly-Pilibhit-Sitarganj project.

NHAI647.57 croresUttar PradeshRunning
Kanpur Ring Road PKG-1 image 1
Kanpur Ring Road PKG-1 image 2

Kanpur Ring Road PKG-1

Development of a six-lane greenfield ring road bypass (Package I: Sachendi to Mandhana Road), starting from design chainage 0.000 to 23.325 km (total length 23.325 km), around Kanpur district, Uttar Pradesh. This project is part of NHDP Phase VII and will be executed under EPC mode.

NHAI647.42 croresUttar PradeshRunning
Moradabad PKG-2 image 1
Moradabad PKG-2 image 2

Moradabad PKG-2

Improvement and upgradation of the NH-734 section from Moradabad to Thakurdwara, including the Moradabad and Kashipur bypasses, on an EPC basis in Uttar Pradesh and Uttarakhand. This is Package II, covering a length of 39.750 km, starting from chainage 0.00 (existing km 389.00 at Bijna).

NHAI624.70 croresUttar PradeshRunning
Hardoi Package -2A image 1
Hardoi Package -2A image 2

Hardoi Package -2A

Improvement and upgradation of the existing road to a 4-lane configuration with paved shoulders from km 88.750 to km 123.650, extending from the start of Shahjahanpur bypass to the start of Shahabad bypass on NH-731, Uttar Pradesh. This project will be executed on a Hybrid Annuity Mode

NHAI564.76 croresUttar PradeshRunning
Kanpur Ring Road PKG-4 image 1
Kanpur Ring Road PKG-4 image 2

Kanpur Ring Road PKG-4

Development of a six-lane greenfield ring road (Package IV), starting from design chainage 68.650 to 93.209 (total length 24.559 km) around Kanpur city, Uttar Pradesh.

NHAI547.67 croresUttar PradeshRunning
Porsa image 1
Porsa image 2

Porsa

Rehabilitation and upgradation of the Promoting Public-Private Partnership in Madhya Pradesh Road Sector Project (PPP-PMPRSP), Package 26: Porsa-Mehgaon-Mau-Sevda and Jamna-Bilav Road.

MPRDC340 croresMadhya PradeshCompleted
Moradabad PKG-3 image 1
Moradabad PKG-3 image 2

Moradabad PKG-3

Improvement and upgradation of the NH-734 section from Moradabad to Thakurdwara, including the Moradabad and Kashipur bypasses, on an EPC basis in Uttar Pradesh and Uttarakhand. This is Package III, focusing on the Kashipur bypass, with a length of 14.490 km, starting from chainage 38.770 near the UP-UK border.

NHAI287.67 croresUttarakhandRunning
Basti image 1
Basti image 2

Basti

Development of distribution infrastructure in Basti, Siddharthnagar, and Sant Kabir Nagar.

PUVVNL243.88 croresUttar PradeshRunning
Package-29 image 1
Package-29 image 2

Package-29

Development of Roads under Civil Work Package-29

MPRDC188.57 croresMadhya PradeshAwarded
Sanichara image 1
Sanichara image 2

Sanichara

Rehabilitation and upgradation under the Promoting Public-Private Partnership in Madhya Pradesh Road Sector Project (PPP-PMPRSP), Package 27(a): Pahadgadh-Sahasram via Maran-Kanhar (up to Khurjan Road), Noorabad-Padhavali Road to Sanichara Road, and Nepri to Brijgadi via Kishangad-Kukroli Road.

MPRDC174.70 croresMadhya PradeshCompleted
Pahadgadh image 1
Pahadgadh image 2

Pahadgadh

Rehabilitation and Upgradation of Madhya Pradesh Road Sector Project (PPPPMPRSP) Package-27(B): Kailaras to Jaura via Pahadgadh, Manpur, Nirar, and Pagara Road under the Public-Private Partnership Model.

MPRDC174.70 croresMadhya PradeshCompleted
Rath image 1
Rath image 2

Rath

Engineering, Procurement, and Construction (EPC) contract for the upgradation and maintenance of the Rath-Garautha section of SH-42, from km 74.550 to km 110.360.

SH149.90 croresUttar PradeshRunning
Bharatpur image 1
Bharatpur image 2

Bharatpur

Supply, erection, installation, testing, and commissioning of materials and equipment for various activities related to the development of distribution infrastructure at Bharatpur Circle of Jaipur DISCOM, Rajasthan, under the Revamped Distribution Sector Scheme (RDSS) on a turnkey basis

JVVNL147.34 croresRajasthanRunning
Malawan image 1
Malawan image 2

Malawan

Transportation of coal for Jawaharpur Thermal Power Station (TPS), Malawan, Etah, by road from the coal yard of Harduaganj TPS, Aligarh, to the coal yard of Jawaharpur TPS, Malawan, Etah.

UPRVUNL19.48 croresUttar PradeshCompleted
Saurikh Indargarh image 1
Saurikh Indargarh image 2

Saurikh Indargarh

Resurfacing Work with Bituminous Concrete (BC) Using Hot Mix Plant from km 11 to km 22 and km 37 on Saurikh-Indargarh-Makanpur-Araul Road (SH).

UPPWD3.59 croresUttar PradeshCompleted
Bhanwat image 1
Bhanwat image 2

Bhanwat

Renewal of Mainpuri-Bhanwat-Kishni Road (ODR) from km 16.00 to km 29.900.

UPPWD2.49 croresUttar PradeshCompleted
Saurikh Makanpur image 1
Saurikh Makanpur image 2

Saurikh Makanpur

Resurfacing Work with Bituminous Concrete (BC) Using Hot Mix Plant from km 23 to km 33.500 and km 36 on Saurikh-Indargarh-Makanpur-Araul Road (SH).

PWD2.14 croresUttar PradeshCompleted
Malikpur image 1
Malikpur image 2

Malikpur

Resurfacing Work with Bituminous Concrete (BC) Using Hot Mix Plant from km 5 to km 14 on Malikpur-Talgram-Indargarh-Bahosi-Umarda Road (MDR).

PWD1.74 croresUttar PradeshCompleted
Kiratpur image 1
Kiratpur image 2

Kiratpur

General Renewal of Kiratpur-Barnahal-Dehuli-Ukhand Road from km 24.00 to km 31.00 .

UPPWD1.68 croresUttar PradeshCompleted
Navinkaran image 1
Navinkaran image 2

Navinkaran

Resurfacing with Bituminous Concrete (BC) Using a Mix Plant.

UPPWD1.19 croresUttar PradeshCompleted
Khadini Haseran image 1
Khadini Haseran image 2

Khadini Haseran

Resurfacing Work with Paver Concrete (PC) Using Hot Mix Plant on Khadini-Haseran-Umarda Canal Road

UPPWD1.14 croresUttar PradeshCompleted
Sakrava image 1
Sakrava image 2

Sakrava

Renovation with General Repair on Kishni-Shamsherganj-Legaon-Sakrava Road (ODR).

UPPWD1.04 croresUttar PradeshCompleted
Tirwa Indegarh image 1
Tirwa Indegarh image 2

Tirwa Indegarh

Resurfacing Work with Paver Concrete (PC) Using Hot Mix Plant on Tirwa-Saraiya-Indergarh-Gunha Bridge via Palyora Road.

UPPWD0.98 croresUttar PradeshCompleted
Khadini image 1
Khadini image 2

Khadini

Resurfacing Work with Paver Concrete (PC) Using Hot Mix Plant on SNTTM Marg to Roshen Hazratpur, passing through Khadini-Husepur-Palan Adda Road.

UPPWD0.86 croresUttar PradeshCompleted
Roshen Hazarat image 1
Roshen Hazarat image 2

Roshen Hazarat

Resurfacing Work Using Hot Mix Plant from km 9.100 to km 18.200 on the SNTTM Marg to Roshen Hazrat-Khadini-Husepur-Palan Adda Road.

UPPWD0.74 croresUttar PradeshCompleted
Parashurampur image 1
Parashurampur image 2

Parashurampur

General Renewal of Karhal-Barnahal via Parashurampur Road from km 7 to km 13.500, including km 9.800, 10.650, and 11.700.

UPPWD0.70 croresUttar PradeshCompleted
Tirwa Saraiya image 1
Tirwa Saraiya image 2

Tirwa Saraiya

Tirwa-Saraiya-Indargarh-Gunha Bridge via Palyora Road.

PWD0.36 croresUttar PradeshCompleted

Raj Corporation Limited

Building isn't just a job. At the construction company, it is our passion. With every project we undertake, we set the bar high and provide the best people in the industry.